• 设为首页
  • 点击收藏
  • 手机版
    手机扫一扫访问
    迪恩网络手机版
  • 关注官方公众号
    微信扫一扫关注
    迪恩网络公众号

microgrid/matlab-microgrid-components: A simulation to find the optimized sizes ...

原作者: [db:作者] 来自: 网络 收藏 邀请

开源软件名称(OpenSource Name):

microgrid/matlab-microgrid-components

开源软件地址(OpenSource Url):

https://github.com/microgrid/matlab-microgrid-components

开源编程语言(OpenSource Language):

MATLAB 100.0%

开源软件介绍(OpenSource Introduction):

Matlab Microgrid Components

A simulation to find the optimized sizes of microgrid components (PV and battery) constrained by a certain acceptable loss of load percentage and by budget. This simulation is written by Stefano Mandelli and expanded by Håkon Duus.

Todo list (possibilities)

  • optimize the minimal State of Charge of the battery, SoC_min, w.r.t. cost since SoC_min influences the battery lifetime and depends on the battery type. Then SoC_min will be an output value instead of input. N.B. CyclesToFailure() also depends on the battery and must be changed then.
  • Play with the value of LLP_var. Is now very small.
  • Could include X days of autonomy in LoadCurve (randomly placed Y times)
  • A. Algorithm e.g. start with graphical point of view
  • B. include error bar (and shifts) in load curve
  • C. Rewrite in Python
  • D. spikes. Play with stepsize and make a test.
  • E. visual interface of graphs (Honorat)
  • F. Think about dependance on square meters. x, t, m2. (m2 can be obtained from the rated power PV_size and the type of PV). Alternative is to write this out (and ask for these inputs explicitly).
  • genetic algorithm? (Honorat)
  • check that fig(6) is correct i.e. that always 8 sets of batteries. It is not! Compare with output of original script (stepsizes 2 and 5).

new

  • determine search range from integration (needed since if no value is found at all for LLP=10 then script does not know which way to go)
  • parallellize
  • change 2dPlots to only plotting for optimal solution instead of 2nd steps (1. rewrite matrices with 3 coordinates to 2 coordinates with arrays over time as elements. 2. change place of plots to bottom, outside for loop.)

Todo list (tests)

  • give error if SoC < 20% (It may never be zero)
  • give error if NPC_opt empty and define PV_opt, Batt_opt for that case
  • check that range of PV and battery is divisible by PV_step and Batt_step
  • evt. check that size of dimensions is larger than one s.t. taken over right dimension?
  • give error if squeeze() squeezes more than time due to weird initial values

Todo list (assumptions)

  • coeff_cost_BoSeI is now 20% of total cost. Is this reliable or can it vary a lot? May have large impact on costs.

Todo rewrite (would be nice; not needed)

  • The loop 'for i = 1 : size(posPV, 1)' s.t. loop not needed
  • Combine all ifs to ifelse
  • change batt_balance(1,t) to vector i.e. without 1 everywhere



鲜花

握手

雷人

路过

鸡蛋
该文章已有0人参与评论

请发表评论

全部评论

专题导读
热门推荐
阅读排行榜

扫描微信二维码

查看手机版网站

随时了解更新最新资讯

139-2527-9053

在线客服(服务时间 9:00~18:00)

在线QQ客服
地址:深圳市南山区西丽大学城创智工业园
电邮:jeky_zhao#qq.com
移动电话:139-2527-9053

Powered by 互联科技 X3.4© 2001-2213 极客世界.|Sitemap