integration testing - How can I skip tests in maven install goal, while running them in maven test goal?

I have a multi-module maven project with both integration and unit tests in the same folder (src/test/java). Integration tests are marked with @Category(IntegrationTest.class). I want to end up with the following setup:

  1. If I run mvn install, I want all tests to compile, but I do not want to execute any.
  2. If I run mvn test, I want all tests to compile, but execute only unit tests.
  3. If I run mvn integration-test, I want to compile and execute all tests.

The important point is, I want this configured in the pom.xml without any extra commandline arguments.

Currently I came up with the following setup in my parent pom.xml, where the only problem is #1, where all tests are executed:

<build>
    <pluginManagement>
        <plugins>
            <plugin>
                <groupId>org.apache.maven.plugins</groupId>
                <artifactId>maven-compiler-plugin</artifactId>
                <configuration>
                    <source>${project.java.version}</source>
                    <target>${project.java.version}</target>
                </configuration>
            </plugin>

            <plugin>
                <groupId>org.apache.maven.plugins</groupId>
                <artifactId>maven-surefire-plugin</artifactId>
                <version>2.14.1</version>
                <dependencies>
                    <dependency>
                        <groupId>org.apache.maven.surefire</groupId>
                        <artifactId>surefire-junit47</artifactId>
                        <version>2.14.1</version>
                    </dependency>
                </dependencies>
                <configuration>
                    <includes>
                        <include>**/*.class</include>
                    </includes>
                    <excludedGroups>cz.cuni.xrg.intlib.commons.IntegrationTest</excludedGroups>
                </configuration>
            </plugin>

            <plugin>
                <artifactId>maven-failsafe-plugin</artifactId>
                <version>2.14.1</version>
                <dependencies>
                    <dependency>
                        <groupId>org.apache.maven.surefire</groupId>
                        <artifactId>surefire-junit47</artifactId>
                        <version>2.14.1</version>
                    </dependency>
                </dependencies>
                <configuration>
                    <groups>cz.cuni.xrg.intlib.commons.IntegrationTest</groups>
                </configuration>
                <executions>
                    <execution>
                        <goals>
                            <goal>integration-test</goal>
                            <goal>verify</goal>
                        </goals>
                        <configuration>
                            <includes>
                                <include>**/*.class</include>
                            </includes>
                        </configuration>
                    </execution>
                </executions>
            </plugin>
        </plugins>
    </pluginManagement>
</build>

All child modules have the following plugin configuration in their pom.xml, which I believe should inherit from the parent pom:

<build> 
    <plugins>
        <plugin>
            <groupId>org.apache.maven.plugins</groupId>
            <artifactId>maven-surefire-plugin</artifactId>
        </plugin>

        <plugin>
            <artifactId>maven-failsafe-plugin</artifactId>
        </plugin>
    </plugins>
</build>

I tried using <skipTests>true</skipTests>, but it disables test execution for all goals, which is not what I want (violates #2 and #3). It is also quite weird, that mvn test honors the skipTests=true option...why would I want to run it in the first place??

After hours of googling and trying different combinations, I am hesitant whether it is even possible to not run tests in mvn install, while at the same time run them in mvn test. I hope someone proves this wrong. ;)

I am also willing to accept a solution, where mvn install would execute only unit tests, but I don't think it makes much difference.

See Question&Answers more detail:os

与恶龙缠斗过久,自身亦成为恶龙;凝视深渊过久,深渊将回以凝视…
Welcome To Ask or Share your Answers For Others

1 Reply

0 votes
by (71.8m points)

It sounds like you didn't understand the concept of the build life-cycle in Maven. If you run mvn install all life-cycle phases (including the install phase itself) run before the install phase. This means running the following phases:

  1. validate
  2. initialize
  3. generate-sources
  4. process-sources
  5. generate-resources
  6. process-resources
  7. compile
  8. process-classes
  9. generate-test-sources
  10. process-test-sources
  11. generate-test-resources
  12. process-test-resources
  13. test-compile
  14. process-test-classes
  15. test
  16. prepare-package
  17. package
  18. pre-integration-test
  19. integration-test
  20. post-integration-test
  21. verify
  22. install

which means in other words the test as well as integration-test life-cycle phases are included. So without any supplemental information it's not possible to change the behaviour as you wish it.

It could be achieved by using a profile in Maven:

 <project>
  [...]
  <profiles>
    <profile>
      <id>no-unit-tests</id>
      <build>
        <plugins>
          <plugin>
            <groupId>org.apache.maven.plugins</groupId>
            <artifactId>maven-surefire-plugin</artifactId>
            <configuration>
              <skipTests>true</skipTests>
            </configuration>
          </plugin>
        </plugins>
      </build>
    </profile>
  </profiles>
  [...]
</project>

So your first requirement:

  1. If I run mvn install, I want all tests to compile, but I do not want to execute any.

can be achieved by using the following:

mvn -Pno-unit-test test
  1. If I run mvn test, I want all tests to compile, but execute only unit tests.

This can simply achieved by using the plain call:

mvn test

cause the integration tests phase is not run (see the build life cycle).

  1. If I run mvn integration-test, I want to compile and execute all tests.

This means running the default which includes running the test phase which will run the unit tests (maven-surefire-plugin) and furthermore running the integration test which are handled by the maven-failsafe-plugin. But you should be aware that if you like to call the integration tests you should using the following command:

mvn verify

instead, cause you missed the post-integration-test phase in your previous call.

Apart from the above you should follow the naming conventions for unit and integration tests where unit tests should be named like the following:

<includes>
 <include>**/*Test*.java</include>
 <include>**/*Test.java</include>
 <include>**/*TestCase.java</include>
</includes>

and integration tests should be named like the following:

<includes>
 <include>**/IT*.java</include>
 <include>**/*IT.java</include>
 <include>**/*ITCase.java</include>
</includes>

I hope you have configured the maven-failsafe-plugin like the following which is needed to bound the maven-failsafe-plugin to the correct life-cycle-phases:

<project>
  [...]
  <build>
    <plugins>
      <plugin>
        <groupId>org.apache.maven.plugins</groupId>
        <artifactId>maven-failsafe-plugin</artifactId>
        <version>2.15</version>
        <executions>
          <execution>
            <goals>
              <goal>integration-test</goal>
              <goal>verify</goal>
            </goals>
          </execution>
        </executions>
      </plugin>
    </plugins>
  </build>
  [...]
</project>

as you correctly did, but you should be aware that the include tags work on the source code (.java) and not on the compiled names (.class). I wouldn't use the Category annotation, just simply using the naming conventions makes the pom simpler and shorter.