I'm doing some benchmarking, and I want to use Excel to produce graphs of the results. I've got a simple but annoying problem which is baking my noodle.
The problem is that Excel insists that "time" means a time of day. It refuses to let me work with time durations. When I try to say "three minutes and six seconds", it misinterprets this as "three minutes and six seconds past midnight", which isn't what I meant at all.
I can work around the problem by laboriously converting everything to seconds. But then all my graphs are labelled in seconds, not minutes and seconds. Plus it's a pain to have to keep typing in =3*60+6
rather than just 3:06
. And once I've done it, I have to look at the formula to check whether I entered the data correctly [and didn't screw up the formula].
Does anybody know how I can make Excel work with a time duration not anchored to a specific time of day?
See Question&Answers more detail:
os 与恶龙缠斗过久,自身亦成为恶龙;凝视深渊过久,深渊将回以凝视…